Prince Edward Road MRT station
CCL · CC32
Prince Edward Road station in detail

Prince Edward Road is the newest of the Circle Line's three Stage 6 stations, opened on 12 July 2026 alongside Keppel and Cantonment. It sits at the southern edge of the Shenton Way office district, giving the area's banks, law firms and shipping companies a direct MRT stop for the first time rather than a long walk from Tanjong Pagar or Downtown. The station is also the terminus for the short spur service that runs from Dhoby Ghaut, so not every Circle Line train that reaches Prince Edward Road continues round the rest of the loop — check the destination display before boarding if you need to keep going. As with the other two new stations, the surrounding streets are still largely business premises rather than shops or dining, reflecting the office-district character of the area it serves.
What is around Prince Edward Road?
Connections from this station
Fares and travel times from Prince Edward Road
| To | Distance | Adult fare | Before 07:45 |
|---|---|---|---|
| Dhoby Ghaut | 3.7 km | S$1.38 | S$0.88 |
| City Hall | 2.9 km | S$1.28 | S$0.78 |
| Raffles Place | 1.6 km | S$1.28 | S$0.78 |
| Orchard | 4.7 km | S$1.49 | S$0.99 |
| Jurong East | 16.8 km | S$2.15 | S$1.65 |
| Changi Airport | 22.9 km | S$2.36 | S$1.86 |
| Bayfront | 2.2 km | S$1.28 | S$0.78 |
| HarbourFront | 3.7 km | S$1.38 | S$0.88 |
Indicative distance-based card fares. Tap in before 07:45 on a weekday and 50 cents comes off any fare. Work out an exact route in the route planner.
Facilities at Prince Edward Road
Because Prince Edward Road is a spur terminus as well as a through station, double-check the destination display before boarding — a train signed for here will not necessarily continue round the rest of the loop.
Other stations on this line
Prince Edward Road — frequently asked questions
On 12 July 2026, with Keppel and Cantonment, completing Circle Line Stage 6 and finally closing the loop after 17 years of construction in stages.
No, it is served only by the Circle Line, though it is also the terminus for spur trains running from Dhoby Ghaut — check the destination board, as not all Circle Line trains reach here.
Yes — Stage 6, which opened Prince Edward Road along with Keppel and Cantonment, closed the loop after 17 years, joining HarbourFront back round to Marina Bay.
Add this site to your favourites
We update Singapore MRT as soon as anything changes — new stations, timetable adjustments, service disruptions and fare changes. Save the page and check it before you travel so you always have the current information.